top of page
I can make one motor work. Making thousands work is different. Here are 7 Proto vs. Production lessons.
After years of developing motors, I’ve learned one thing. Prototype proves it. Production validates it. Cost, tolerances, testing, reliability, And serviceability change everything. Prototype and production are two worlds. I’ve captured some key differences in this carousel. ⚙️ Can your prototype survive 10,000 units? #ElectricMotors #EV #MotorDesign #Manufacturing
Murali krishna
4 days ago1 min read


India doesn't need more EV startups.
India doesn't need more EV startups. It needs 500 more component suppliers. Components include motors, Controllers, batteries, and BMS. Also chargers, ECUs, and Supporting accessories. The evolution of India's trade shows is already making this visible. Strong supply chains build strong industries. Suppliers create speed, quality, and resilience. A strong ecosystem needs both people and products. Trade shows and exhibitions are evolving rapidly. My recent visit to the MOG
Murali krishna
Sep 21 min read


The first EV battle was range. The second was charging speed. The next battle may be manufacturing efficiency.
The first EV battle was range. The second was charging speed. The next battle may be manufacturing efficiency. Who can build better motors? With fewer rare materials? At lower cost? At higher efficiency? And at scale? Winning all four won't be easy. But the companies that do may Would dominate the next decade. If you had to pick just one challenge, which would it be? #ElectricVehicles #ElectricMotors #Manufacturing #EVInnovation
Murali krishna
Aug 21 min read


I saw more than automotive components. I saw India's industrial growth.
Yesterday, visited the Auto Components Show 2026. The variety of exhibitors surprised me. Almost every vehicle system appeared. Harnesses, lamps, fasteners, body parts. Audio systems and lubricants too. Manufacturing machines caught my attention. Every small component had a specialist. That's how strong industries are built. AUTOROBOT EXPO Chennai 2026 was interesting too. Automation was the main focus. 🤖 Factories are becoming much smarter. Material handling looked very adv
Murali krishna
Aug 11 min read


India doesn't need more EV startups.It needs 500 more component suppliers.
Components include motors, Controllers, batteries, and BMS. Also chargers, ECUs, and Supporting accessories. Skills development matters as much. In my previous post, I shared my Experience working there for 5 years. China didn't build an EV industry. It built an EV ecosystem. Including Skilled people. India needs the same approach. Strong supply chains build strong industries. Suppliers create speed, quality, and resilience. A strong ecosystem needs both people and products.
Murali krishna
Jul 251 min read


24% cars. 19% two-wheelers. 26% three-wheelers. 📈I couldn't stop thinking about these numbers.India's manufacturing story was changing.
24% cars. 19% two-wheelers. 26% three-wheelers. 📈 I couldn't stop thinking about these numbers. India's manufacturing story was changing. Many celebrate higher sales. I see engineering opportunities. I imagine busier factories. For EV companies, this matters in specific ways Behind every 1% growth lies thousands of parts. More motors. More controllers. More batteries. More testing hours. More engineers solving problems. Demand drives technology investments. Factories must sc
Murali krishna
Jul 231 min read


₹3,250 crore, 235,000 engines, 600 jobs.I see India's manufacturing future in these numbers.Do you agree?
₹3,250 crore, 235,000 engines, 600 jobs. I see India's manufacturing future in these numbers. Do you agree? Ford once closed this chapter. Many thought it had ended. Now, the story continues. Ford's India manufacturing- Journey moves forward. Ford plans 235,000 engines yearly. Production starts from 2029. Over 600 direct jobs follow. Whenever a factory restarts, I think beyond production. I think about the engineers who will build it. Engines aren't the biggest outcome. Manuf
Murali krishna
Jul 221 min read


Royal Enfield in Andhra Pradesh. ❤️My heart smiled twice today.
Royal Enfield in Andhra Pradesh. ❤️ My heart smiled twice today. This news brought pride and emotion together. Never imagined I would see RE In my home state one day. ₹2,200 crore investment planned in Satyavedu, Tirupati district. Around 267 acres allocated. Nearly 3,000 direct jobs expected. Phase 1 targeted by 2029. Phase 2 planned by 2032. Royal Enfield entering Andhra Pradesh feels very personal to me. Hope this creates opportunities for Thousands of young engineers. Thi
Murali krishna
May 71 min read
bottom of page